Thursday, September 29, 2011

Let's have some more road blocks... with a side of fries please...

Since my last posting, we've received our Driveway Permit.  It was like pulling teeth to get the Road Agent to meet up with our contractor (Mike's cousin Eric) for the driveway, but it happened because the one Selectman that wanted to help us is a good friend of the road agent apparently.

We met with both the selectman and the road agent along with Eric a couple of Saturdays ago.  We were able to get the location OK'd.  In the background, we found out that the road agent was giving Eric a very hard time about how the driveway needs to go in and all this crap he needs to do.  He kept saying to Eric that he was concerned for our safety (meaning Mike's and mine) as well as others on the road.  The way it sounded was that the road agent was badgering Eric.  Eric finally got fed up and told him that he's Mike's cousin so of course he wants to do a good job and make sure it's safe!

So not only did we have to put a huge bond in ($3000!! Let me tell you my heart jumped into my throat when we were told this amount) for the Road Bond (so don't screw up the road and we get it back), but now that Eric is ready to start the driveway, he's getting more crap from the Road Agent.  Eric's truck broke down but he wants to move forward with this project so Mike and I can finally drive up into our lot instead of lug all our crap from the road, which isn't safe in itself.  He has a friend that trucks so he has to get new trucking permits for his friend so that it's all legal.  He wanted to start the driveway today, but it was raining so, can't really do this stuff in the rain.

Anyways, the trucker that's going to be trucking in stuff to our land freaked out that it was in this particular town because of how much he dislikes the road agent.  Apparently, we aren't the only ones that have had serious trouble with this road agent or with the town in general.  Serves us right for wanting to live in a nice town I guess.   It makes me sad to say that I have a bad taste in my mouth because of this process.  Anyways, he agreed to truck for us anyways since Eric's truck is down.

So after the road agent freaked out on Eric, they were finally able to set a time to meet tomorrow (since Eric is pushing to start this tomorrow) at 8 AM.  Well apparently, Eric just got another call from the road agent which then told him that he can't be there till 11 AM.

This is just becoming more and more BS.

On top of all of this, when we got our permit there was a two page addendum. One that addendum from the Road Agent, there included a minimum apron that must be put on the driveway before it's considered complete... it's 20 freaking feet!  There is no reason for an apron to be so long!

I have so many words for this Road Agent and for the town.  We've had nothing but headaches since we started this process.  I can't imagine what building our house will be like... but this just pisses me off to the point where I want to do it just in spite of them.  They don't want to see our house from the road (and right now, where we plan on putting our house, they won't... they never said anything about garages... maybe we should build the garage right in view and have it so that it's multicolored or super ugly.  Anything to piss them off at this point.

I know, that's not nice of me... but someone needs to talk to them.  This is absolutely ridiculous!

Warning to all: If you decide to try to buy land in what seems to be a small, quaint, pretty town... think twice and look elsewhere... if you are looking to live in the same town as us... DON'T DO IT!

Thursday, September 15, 2011

Driveway and Progress... They Do Go Together!

Well, it looks like we are finally getting somewhere on our land.  We met with the Selectmen this past Tuesday.  As some of you already know, we’ve been getting the run around since day 1.  We don’t have a driveway yet and we’ve been actively trying to get one since the early part of March.  We started this process, though, in January!

So we went to the Selectmen’s meeting on Tuesday to discuss what we need and what they need.  The road agent told us that we MAY need an engineer to determine the size of the culvert for our driveway.  We kept being told that we may need an engineer to engineer our driveway.  Well, here’s the problem.  We’ve pretty much exhausted our resources in trying to find someone that can engineer a driveway.  We were laughed at when we would tell them that we were looking for an engineer that could engineer our driveway.

We were laughed at because it simply doesn’t exist in NH.  People who have been in the driveway profession for decades have told us that it’s the Road Agents’ job to determine the size of the culvert.  The Road Agent was telling us we need to find an engineer to do it. If we were actually to get a Civil Engineer, it would cost us a fortune for them to engineer our driveway!  Mike also said that at the meeting to help drive another point home. 

So at our meeting on Tuesday, Mike took the floor and discussed what we’ve done thus far.  He discussed how we got our permit, the length of time it’s taken to not even have a driveway, and what we are going through now.  It was a plead for help but he was extremely firm on points that he gave.  I think they could tell that we were frustrated and at the ends of our rope.  I let Mike do most, if not all, the talking because he was doing such a good job explaining everything and showing his frustration in a very professional kind of way.  I was really impressed, actually! 

Near the end, the guy sitting to my right spoke up and said that they needed to help us.  He really spearheaded the rest of the conversation and asked if he could keep a copy of the application and all the materials that we had brought with us.  He said he was going to talk to the Road Agent and try to work something out.  I got a call earlier today from this particular selectman saying that he was planning on having breakfast/coffee with the road agent in the morning and wanted Mike to give him a call tonight to see if Mike and our driveway contractor could meet them in the morning.  I left Mike a message to let him know and I’m hoping they both can!!

PROGRESS!  It’s such a beautiful thing!

Cross your fingers for us!

Tuesday, August 30, 2011

Wetlands Permit Accepted!


On Saturday, August 27th, we got our Wetlands permit from the State!  That’s 30 days ahead of schedule!  I’m really thrilled that they were able to push it through so fast!  Of course, I think Mike and his boss are right- I think the State would be more concerned about a larger parcel of land being filled for something like a Walmart or a Home Depot or something, and not necessarily as concerned with a few feet to cross for a residence.  It makes sense to me.  I’m sure they are still concerned, but I think they put less emphasis on a home owner than they do a retail store/chain.

Anyways, it’s very exciting news!  Since my last update this is what has happened with this process:

The Conservation Committee of the town would not sign the expedited minimum impact application because they wanted to see the parcel first (and I had offered to show it to them at their monthly meeting, but they wanted to see us first!)  and they wanted us to get it delineated by a forester.  Fine, we got it delineated by a rather well known forester in the area.  Mike got to meet with him and he was very knowledgeable and walked Mike through the whole process and explained what different plants were (like Princess Pine… which do not grow in wetlands- they are an upland plant!).  But since the Committee wouldn’t meet again for another month and told us they would only sign it then, we submitted it anyways.

We brought it to the Town Hall so that the Town Clerk could sign the paperwork.  She was very sweet and it was the first one she’d ever done, so we had to walk her through it.  I made it as painless as possible.  When I brought the paperwork to her, there was the woman from the Conservation Committee there.  She instantly jumped down our throats, told the Town Clerk she was not allowed to sign it until we met with the Committee again.  Mike was a little heated, so I stepped in and asked her why, and she said that we couldn’t submit the paperwork without the Committee’s signature, but I pointed out to her that we didn’t need their signature according to the paperwork that we had filled out and read her the line that said the application would automatically transfer into a Standard Dredge and Fill if the committee didn’t sign it.  She got on the phone with the head of the committee (who is a really nice gentleman) and she continued to try to poke holes through our application process, which I continued to show her the different sections in the application where she was wrong while she was on the phone with him.  He ended up telling her that there was nothing they could do, that we were doing everything according to the book.  I think I upset her and her power trip she was on because I had shown her all the instances in which she was wrong. 

The Town Clerk proceeded to sign all 5 documents and sent the paperwork into the State on July 12th.  On July 19th, we were notified that we were missing one piece of information from the Standard Dredge and Fill, which we hadn’t thought about since we were focused on the Minimum Impact and not the Standard form.  It was a letter and map from NHB stating that there were no recorded findings in the database of rare/exotic plants.  At first I thought that it was going to take forever to get- but they have a website that you can type in the zip code, put a pointer on the map, and they automatically generate and try to find anything in their database of any occurrences of rare/exotic plants!  From there you can download a PDF of the letter and map from NHB and you’re done!  It was so easy! 

So then, the paperwork was resubmitted to the State on July 25th.  The State then has 60 days from the time they send us a notice (which they sent the notice of receiving all necessary paperwork on July 28th, which was super fast in my opinion!) to when they must correspond with us (whether it be them requesting more information or giving us a decision).  From there, we waited, and hoped that they wouldn’t ask for more info over and over again so that we’d have to be stuck in the process.  We just got the permit on Saturday- August 27th!  I wasn’t sure if the State was going to hold onto it for the full 60 days or not, but we got it and can now move forward with submitting for our driveway permit! 

But now we must get the road agent over to the property, show them our plans for the driveway, where we want to put the driveway (where it was approved by the state), and reasoning for putting it there.  We have to draw a plan for the road itself to scale with any obstructions (like hills, corners, trees, other driveways, etc) within 500 feet in either direction.  We hope to get the road agent over there before their next meeting (next Tuesday, September 6th) so that we can then get the permit and push forward and get at least a portion of the driveway put in! 

Hopefully moving forward, this process will become a well oiled wheel.  We could’ve had the entire house up by now if not for the running around like crazy trying to get a hold of people to answer questions and getting the wetlands permit! 

On another positive note, and since this isn’t JUST about building our home (though mostly it is) Mike and I are engaged!  We have the wedding date already set and the wedding will be before we build our home and during a beautiful time of year! <3 I can’t wait to marry my best friend!