Wednesday, April 25, 2012

Appraisal Appeals- Construction and working with Big Banks


I won’t lie- I’m really fed up with this bank that we are dealing with (TD Bank).  When I send them an email, it takes them usually two days to respond.  It’s really quite aggravating- especially since we are getting closer to the closing date.  The stuff we send and do and ask needs to be all done in a timely manner.

Mike and I put together our appraisal appeals.  I wrote 4 pages outlining absolutely everything in our home, what she missed, and I shot holes through each of the houses that she chose as “comparison” properties.  I sent this off to Mike so he could review it and let me know if I misspoke or missed anything.  He then turned around and gave me just over another page that I used for beginning notes since it was a rough overview of everything I had written.

I sent this to the Appeals to the bank first thing on Tuesday, April 17th in the morning.  We wanted to get it in there ASAP so we could still be on target for our closing date.  I sent them the package with a PDF of our tax bill (before improvements to show them that our land was actually worth more than what we had purchased it for PLUS all the improvements will drive the value of the land up). 

I didn’t hear from the two individuals that Mike and I have been dealing with.  I sent an email on Wednesday morning (4/18) and asked a question about the closing as well since Mike and I had discussed how sometimes there are penalties if the closing is pushed because of the client.  No response.  On Thursday in mid-morning I finally got a response from the Bank saying that we also had to come up with three “comparable” properties that we can give to the appraisal company for compares as well.  I don’t think they understand that there is NOT a comparable house in the area, especially with as much land.  We couldn’t find a single house with radiant floor heat, a metal roof, and ICF blocks- the three big things (among other things like the amount of bathrooms -we have 2.5 and none of the others have over 2- granite counter tops, cherry cabinets, etc.).  Yes, there are houses out there with hardwood floors, carpeting and ceramic tiles- but ours is still unique to the market with the radiant floor heat, metal roof, ICF blocks, stamped and dyed concrete, fully finished basement, etc etc. 

Regardless, I found it humorous that we have to supply up to 5 comparable homes.  Unfortunately, the bank didn’t get back to me until THURSDAY last week, so we had to pool our resources and use Mike’s Mom’s real estate contact to help us find houses that have been sold in the last 12 months that more closely meet our home’s criteria.  It’s really hard to do!  We did find 3 homes that we decided to pit up against ours.  All three sold for much higher than what ours appraised at, but they have much less land.  The three do have a bit more sq ft above ground, and one had a partially finished basement.  The only thing working against us I think is that two of the homes had a garage (which we are trying to build as well, but that’s a whole separate issue). 

Anyways I had revised our appeals and sent the appeals with the tax info and three “like” homes from markets that were closer to us in both distance and market appeal.  I also put in a home that is yet to be sold and BUILT in the next town over, but has a lesser market appeal than our town.

You’ll love this.  Guess how much this less than 2 acre land with about 200 sq ft more above ground and not a finished basement is being asked for…??  $272,000.  Yup!  I think it had a one car garage too though.  Regardless, I added that to the appeals form as well.   

So I sent the appeals on Monday (April 23rd) and asked the question about closing and its effects on us AGAIN.  Tuesday went by and I was trying to be patient.  Then this morning comes and still no response.  I decided to send an email AGAIN asking for a status of the submittal of the appeals and if this guy had any answers to my questions on the closing.

He FINALLY responds back that the appeals had been submitted, but never answered my questions on the closing.

CMON!  If I did that at work I’d get my ass kicked!  First, for not responding in a timely manner to begin with and second for not answering all the questions posed!  So I thanked him for sending it along and asked him AGAIN on the closing questions we had.

I mean really, is it laziness or are you so busy you can’t get to me?  Either way- at least tell me you are looking into my question- don’t ignore it completely!

/facepalm.  This whole thing is so ridiculous. Hopefully we will get this all straightened out though!

Monday, April 16, 2012

Bank Appraisals- what a bunch of crap

I've been meaning to post about the plethora of paperwork that you'll need to sign your life away on in order to get a construction loan.  Sorry- really haven't had time.

Mike and I have been working on trying to finish clearing the land.  It's been a very laborious process and I think I've formed muscles in places I never had before!  Regardless- we're hoping for just one more day and we should be all set!

One of the things that you'll need to do is get your project appraised.  Mind you- the bank already has the amount of money you want to borrow at hand.  The appraisal place will take your specs, land layout, blue prints, etc to appraise the house.  They'll also take a look at what other houses are selling for in the area.

Well, we got a call today- so I apologize in advance if this sounds like a complete rant session, but maybe you'll feel the same way Mike and I do after reading this.

The cost to build our house (materials alone) is $145,000.  We have lots of upgrades in the house- like radiant floor heating throughout the first floor and the cellar, energy efficient trusses, ICF blocks for foundation for efficiency, Water on demand for efficiency, windows and doors that are rated for efficiency  (do you see where this is going?!).  Regardless, it's going to cost us about $145,000 to build.  Our land purchase was $55,000 and we've put a good chunk of change into it with putting in a driveway and clearing it ourselves.  The driveway project was almost $10,000, and clearing the land ourselves was a couple new chainsaws, some gas, some bar and chain oil, and lots of man hours, sweat, and blood.  So in TOTAL Just for costs, our house will cost us approx $210,000 to build (including the land and just the driveway portion).

We got our appraisal.  Guess what it was?! First- I should tell you that hte bank will only give you 80% of the appraisal.  As it stands right now- we have put $47,000 of our own money into this project.  We haven't gone out to eat in months (wedding/honeymoon not included) and frankly, haven't been "living" at all because we've been spending so much time and money at the property.  This is not a "feel bad for us" rant, this is a "I'm pissed off especially since we've done all this work to get nowhere" rant.

Ok appraisal... $214,000.  WHAT?!  You're telling me that we have to find a crew that will build our house for a grand total of $4,000?!  That's not possible!  You can imagine how we felt.  In order to borrow the money we need to build, we need the appraisal to come in at about $270.  We can work with a little less, but $270 is our magic number.  Regardless, Mike was pissed and my heart fell to the floor.  Mike was so upset, he actually called the bank (for those that know him well enough, you know he doesn't call ANYONE and makes me do all the calling).  Left a nice message to the lady we've been dealing with and told her to call me directly- that he was too po'd to take any phone calls.

She did call me and told me that there was an appeals process we can use to make the company redo the appraisal.  We're going to do it- but Mike talked me out of writing it up right now- and he's probably right- if we wrote it right now, we'd just be so fired up that we'd put things in there just to piss the appraiser off.

We went through all the paperwork- she's missing a whole bathroom on the first floor- she listed it as a 1/2 bath, and she's missing our 1/2 bath downstairs.  Now, I understand that "below ground" is not worth as much as "above ground" but half of our house is still "above ground" regardless, she put our SQ FT appraisal above ground at about $92/sq ft- and for those of you that understand this- this is really low even in today's market.  The below ground... a whopping $29/sq ft- we can't even build the below ground for that cost- so what the hell is this woman thinking?!  She put asphalt roofing- we have metal... the list goes on.  What makes us the most mad is she did the appraisal using recent sales in the "area" which stretched all the way 30 minutes south of us in a crappy neighborhood.  Of the 3 houses, 2 were older than 30 years and one was 20 years old.  Only one had as much acreage as we, and none of them had as much living space.  In total, their finished "above ground" floors ranged from $110- $148/sq ft... so EXPLAIN to me why ours is only $92?!

We are both so mad it's not even funny.  I want so badly to start building our house- but it's like every turn is a road block.

I'll be writing my wonderful message to the appraiser tomorrow to make sure she understands that she appraised our house wrong.  If it costs us $210 total to build, why is it worth only $214?  The worst part is, we gave her everything down to the countertops of what was going in this house.  The houses she used for comparison didn't have half of what we are putting in our house- especially when it comes to the efficiency matter.

This is not how I envisioned our house being appraised.  It makes me sick.  At least I have Mike to hug me and tell me that we will get it solved- and if the bank can't solve it- we're done with them and going with another one.

Oh and if anyone wants to know, the bank we are currently using is TD Bank, and the Appraiser was Powers, Smith, and Associates, Inc in Keene... in case you don't want to go through the headaches we are... Live and Learn- right?

Building love, through the most trivial experiences.