Wednesday, May 2, 2012

We Won't Back Down


Where to start.  Hopeless- that’s how I feel.  Irish- that’s how much I want to fight right now.  Yes, I’m Irish, so yes, this descriptor applies.

I guess there’s something that most people who don’t know me too well should probably know about me.  Tell me I can’t do something, and I’ll do it.  I won’t fail.  I refuse to fail.  Tell me a second time I can’t do something and I’ll dig right in and prove to you I can.  I won’t stop trying- and maybe that’s a downfall of mine or maybe that’s why some things in my life have worked out the way they have. 

That being said- we received our Appeals for the Appraisal back.  I have no words to describe how much I despise the company (Powers, Smith & Associates in Keene) that was used and the woman that did the appraisal.  First and foremost, as I stated in my last posting, this woman completely missed a full bath.  In putting in that full bath, it should’ve driven the value of the house up at least a little- right?  I would’ve been happy if it even drove it up $5,000.  Realistically, it should’ve driven it up more than that.

We gave this woman our appeals.  I won’t lie, I may have written it as professionally as possible, but it was so hard not to have our frustrations creep in.  It’s obvious that this woman did not appraise the house accurately- she missed a few things and her comparable sales… they weren’t comparable.

We received back her response, and she didn’t change a friggen thing.  Not one penny.  Ok- answer me this… if you FORGOT A WHOLE BATHROOM… how the hell does the value NOT change?!  Am I missing something?  She defended her entire appraisal and didn’t once look at the comparable sales that we were supposed to provide to her.  She never even mentioned them.  

The bank has backed this up by not questioning a thing.  I’m sorry- if I hired a third party to do an appraisal and the client appeals it because a few things were missing and they made their case, the company comes back and doesn’t change anything- I’d be asking some questions. 

TD Bank has really upset us; in fact if I’ve discussed this with you already, you’d know the wonderful colorful language I’ve been using to describe everything from A to Z about them.  It’s not like me, but this is the Irish coming out.  The process is keeping us from having our house.  It’s truly infuriating.

Here’s the other thing.  I get this email from my amazing, awesome, State Farm agent.  The bank requires us to purchase home owners insurance before closing.  Ok- here’s the deal.  TWICE I asked this “Mortgage Loan Specialist” if we had to have it prior to the house being even built and TWICE he said NO – that this is one of those automatically generated things that come up and it would be required before the final disbursement since insurance companies won’t insure a home that does not exist.  So I talked to my awesome State Farm Rep the other day and apparently that has changed… apparently we were misinformed TWICE (after asking twice) that we didn’t need home owners insurance and yes, we have to pay it in full before closing- on a house that doesn’t even exist.  She did take the time to explain to me that it does cover xyz for the building process so, it made more sense I suppose.  Regardless, this is the types of things that TD Bank has put us through.

Please know that this isn’t the only question that I’ve asked several times, got the same answer and then the answer changes.  That coupled with having to explain ourselves more than twice has become a really frustrating point for us.  I’ve had to tell them 3-4 times where a “large deposit” came from… it was from our wedding, and that has since been expunged… no joke- 3-4 times! 

It’s just absolutely ridiculous.  Frankly, if it were me in that job with the pressures we get at my current job, I would’ve been canned.  I can’t tell if it’s laziness, inexperience, or what, but the fact of the matter is, the people I am trying to work with are relatively unresponsive as well. 

I feel like we’ve wasted almost two months trying to just get a loan to build our house.  I feel like we have a great design, but now Mike wants to change it.  I don’t know if that’s the solution because he’s putting more sq ft upstairs, but that means more$$ being spent upstairs. 

We need a private investor or a different bank willing to work with us.  Before I tell them to colorfully go play with themselves.. ahem, I asked Mike if I could get 4 questions answered.  1, if we could bring the loan amount down to the 80% of the appraisal.  We can build the house for that, but it would be without labor, so it would be a little tight.  2, since Lisa contacted me at State farm, I wanted them to explain what was going on since I had been told one thing and now another.  3, I had asked a question about the closing and how this affects the closing date and what costs would be incurred.  I asked this FIVE times before he answered me – and he only answered me because I had to put my foot down and put it in an email with these three other questions before Mike and I would make a decision on this loan.  4, our credit score.  When we went for the loan with the bank back in February, we told them not to submit it.  They did anyways and our credit was run.  We want it fixed.  I was told that the corporate office can’t fix it- that we would have to go back to that individual branch to have it fixed…. REALLY?!  Pretty sure the branch answers to the corporate office- or am I off my rocker?  I reminded him moments ago that our credit score was run twice this second time so I want to have it fixed.

Anyways- this is the headache that Mike and I are facing.  Sorry it’s so long, but here’s a warning to all:

If you decide to go for a construction loan or a regular mortgage through TD Bank- I would like to say beware!  I’ve been a client of theirs for 20 years (well it was Bank of NH back then, but regardless, I’ve had the same account number with them for 20 years).  I have never been so disappointed in my entire life with a company. 

Also- if you are in the process of a mortgage in our area and they hire or wish to hire Powers, Smith & Associates in Keene to do the appraisal- request another appraiser.  The appraiser might walk through the house and walk past a bathroom and not have it in the appraisal of the house- just saying.

Mike and I will be going to another bank to try this all over again.  A complete waste of time.  I put a call in to the woman we worked with last year to get some guidance from her- so hopefully something good comes of it.  I’m thinking of talking to a much smaller bank in the area- they do construction loans and have no fee rate locks, be your own GC, and one time closings.  I think they might do better by us- but I want to know where this woman is first and see what she can do.  The bank that I want to look into is First Colebrook.  They sound pretty decent and I’ve heard good things.

I just want a place of our own so we can start our family… 

Wednesday, April 25, 2012

Appraisal Appeals- Construction and working with Big Banks


I won’t lie- I’m really fed up with this bank that we are dealing with (TD Bank).  When I send them an email, it takes them usually two days to respond.  It’s really quite aggravating- especially since we are getting closer to the closing date.  The stuff we send and do and ask needs to be all done in a timely manner.

Mike and I put together our appraisal appeals.  I wrote 4 pages outlining absolutely everything in our home, what she missed, and I shot holes through each of the houses that she chose as “comparison” properties.  I sent this off to Mike so he could review it and let me know if I misspoke or missed anything.  He then turned around and gave me just over another page that I used for beginning notes since it was a rough overview of everything I had written.

I sent this to the Appeals to the bank first thing on Tuesday, April 17th in the morning.  We wanted to get it in there ASAP so we could still be on target for our closing date.  I sent them the package with a PDF of our tax bill (before improvements to show them that our land was actually worth more than what we had purchased it for PLUS all the improvements will drive the value of the land up). 

I didn’t hear from the two individuals that Mike and I have been dealing with.  I sent an email on Wednesday morning (4/18) and asked a question about the closing as well since Mike and I had discussed how sometimes there are penalties if the closing is pushed because of the client.  No response.  On Thursday in mid-morning I finally got a response from the Bank saying that we also had to come up with three “comparable” properties that we can give to the appraisal company for compares as well.  I don’t think they understand that there is NOT a comparable house in the area, especially with as much land.  We couldn’t find a single house with radiant floor heat, a metal roof, and ICF blocks- the three big things (among other things like the amount of bathrooms -we have 2.5 and none of the others have over 2- granite counter tops, cherry cabinets, etc.).  Yes, there are houses out there with hardwood floors, carpeting and ceramic tiles- but ours is still unique to the market with the radiant floor heat, metal roof, ICF blocks, stamped and dyed concrete, fully finished basement, etc etc. 

Regardless, I found it humorous that we have to supply up to 5 comparable homes.  Unfortunately, the bank didn’t get back to me until THURSDAY last week, so we had to pool our resources and use Mike’s Mom’s real estate contact to help us find houses that have been sold in the last 12 months that more closely meet our home’s criteria.  It’s really hard to do!  We did find 3 homes that we decided to pit up against ours.  All three sold for much higher than what ours appraised at, but they have much less land.  The three do have a bit more sq ft above ground, and one had a partially finished basement.  The only thing working against us I think is that two of the homes had a garage (which we are trying to build as well, but that’s a whole separate issue). 

Anyways I had revised our appeals and sent the appeals with the tax info and three “like” homes from markets that were closer to us in both distance and market appeal.  I also put in a home that is yet to be sold and BUILT in the next town over, but has a lesser market appeal than our town.

You’ll love this.  Guess how much this less than 2 acre land with about 200 sq ft more above ground and not a finished basement is being asked for…??  $272,000.  Yup!  I think it had a one car garage too though.  Regardless, I added that to the appeals form as well.   

So I sent the appeals on Monday (April 23rd) and asked the question about closing and its effects on us AGAIN.  Tuesday went by and I was trying to be patient.  Then this morning comes and still no response.  I decided to send an email AGAIN asking for a status of the submittal of the appeals and if this guy had any answers to my questions on the closing.

He FINALLY responds back that the appeals had been submitted, but never answered my questions on the closing.

CMON!  If I did that at work I’d get my ass kicked!  First, for not responding in a timely manner to begin with and second for not answering all the questions posed!  So I thanked him for sending it along and asked him AGAIN on the closing questions we had.

I mean really, is it laziness or are you so busy you can’t get to me?  Either way- at least tell me you are looking into my question- don’t ignore it completely!

/facepalm.  This whole thing is so ridiculous. Hopefully we will get this all straightened out though!

Monday, April 16, 2012

Bank Appraisals- what a bunch of crap

I've been meaning to post about the plethora of paperwork that you'll need to sign your life away on in order to get a construction loan.  Sorry- really haven't had time.

Mike and I have been working on trying to finish clearing the land.  It's been a very laborious process and I think I've formed muscles in places I never had before!  Regardless- we're hoping for just one more day and we should be all set!

One of the things that you'll need to do is get your project appraised.  Mind you- the bank already has the amount of money you want to borrow at hand.  The appraisal place will take your specs, land layout, blue prints, etc to appraise the house.  They'll also take a look at what other houses are selling for in the area.

Well, we got a call today- so I apologize in advance if this sounds like a complete rant session, but maybe you'll feel the same way Mike and I do after reading this.

The cost to build our house (materials alone) is $145,000.  We have lots of upgrades in the house- like radiant floor heating throughout the first floor and the cellar, energy efficient trusses, ICF blocks for foundation for efficiency, Water on demand for efficiency, windows and doors that are rated for efficiency  (do you see where this is going?!).  Regardless, it's going to cost us about $145,000 to build.  Our land purchase was $55,000 and we've put a good chunk of change into it with putting in a driveway and clearing it ourselves.  The driveway project was almost $10,000, and clearing the land ourselves was a couple new chainsaws, some gas, some bar and chain oil, and lots of man hours, sweat, and blood.  So in TOTAL Just for costs, our house will cost us approx $210,000 to build (including the land and just the driveway portion).

We got our appraisal.  Guess what it was?! First- I should tell you that hte bank will only give you 80% of the appraisal.  As it stands right now- we have put $47,000 of our own money into this project.  We haven't gone out to eat in months (wedding/honeymoon not included) and frankly, haven't been "living" at all because we've been spending so much time and money at the property.  This is not a "feel bad for us" rant, this is a "I'm pissed off especially since we've done all this work to get nowhere" rant.

Ok appraisal... $214,000.  WHAT?!  You're telling me that we have to find a crew that will build our house for a grand total of $4,000?!  That's not possible!  You can imagine how we felt.  In order to borrow the money we need to build, we need the appraisal to come in at about $270.  We can work with a little less, but $270 is our magic number.  Regardless, Mike was pissed and my heart fell to the floor.  Mike was so upset, he actually called the bank (for those that know him well enough, you know he doesn't call ANYONE and makes me do all the calling).  Left a nice message to the lady we've been dealing with and told her to call me directly- that he was too po'd to take any phone calls.

She did call me and told me that there was an appeals process we can use to make the company redo the appraisal.  We're going to do it- but Mike talked me out of writing it up right now- and he's probably right- if we wrote it right now, we'd just be so fired up that we'd put things in there just to piss the appraiser off.

We went through all the paperwork- she's missing a whole bathroom on the first floor- she listed it as a 1/2 bath, and she's missing our 1/2 bath downstairs.  Now, I understand that "below ground" is not worth as much as "above ground" but half of our house is still "above ground" regardless, she put our SQ FT appraisal above ground at about $92/sq ft- and for those of you that understand this- this is really low even in today's market.  The below ground... a whopping $29/sq ft- we can't even build the below ground for that cost- so what the hell is this woman thinking?!  She put asphalt roofing- we have metal... the list goes on.  What makes us the most mad is she did the appraisal using recent sales in the "area" which stretched all the way 30 minutes south of us in a crappy neighborhood.  Of the 3 houses, 2 were older than 30 years and one was 20 years old.  Only one had as much acreage as we, and none of them had as much living space.  In total, their finished "above ground" floors ranged from $110- $148/sq ft... so EXPLAIN to me why ours is only $92?!

We are both so mad it's not even funny.  I want so badly to start building our house- but it's like every turn is a road block.

I'll be writing my wonderful message to the appraiser tomorrow to make sure she understands that she appraised our house wrong.  If it costs us $210 total to build, why is it worth only $214?  The worst part is, we gave her everything down to the countertops of what was going in this house.  The houses she used for comparison didn't have half of what we are putting in our house- especially when it comes to the efficiency matter.

This is not how I envisioned our house being appraised.  It makes me sick.  At least I have Mike to hug me and tell me that we will get it solved- and if the bank can't solve it- we're done with them and going with another one.

Oh and if anyone wants to know, the bank we are currently using is TD Bank, and the Appraiser was Powers, Smith, and Associates, Inc in Keene... in case you don't want to go through the headaches we are... Live and Learn- right?

Building love, through the most trivial experiences.

Friday, March 30, 2012

Construction Loan Application- Our Experience


Two weeks ago, Mike and I sat down with the bank.  Now, I know many of you know of the troubles we had with this same bank (different branch) in trying to set up our construction loan.  They plugged everything they needed to into their computer and they were magically coming up with closing costs of over $30,000!  Needless to say we were quite upset about it seeing that we’ve already dumped everything we have into the land itself and the improvements that we’ve made on it (ie the driveway).  Even though we told these two individuals that we shouldn’t have to come up with anything considering how much we’ve already put into the property and the fact that we’ve owned it for over a year, they didn’t do anything about it.  The people we worked with had never done a construction loan before- so they didn’t really understand how they are supposed to work.  Our benefit was that we had talked to a woman at that same bank about a year before and she had given us a bunch of information on what kind of closing costs we’d have and how the construction loan works.  Unfortunately, this woman retired, so we had to go to this set of people that had never done one before.

That was in late February, just before our wedding.  They had submitted our application even though we asked them to hold it until Mike and I could decide what to do.  Once it got submitted, our credit was checked…awesome.  We pulled the application so that Mike and I could get some answers on this stuff before we officially got the application into the bank. 

We got back from our honeymoon and started to set in on this project again.  This time, we decided to call around to other banks, get more information, and make sure that we are covered so that we don’t have to come up with a ridiculous amount of money just to try to secure a loan when we already have put so much into the property.  I called around to a bunch of different banks- many don’t actually do construction loans anymore.  The couple of other banks that I talked to had some very strange and ridiculous rules- obviously protecting the bank, but in no way allowing us to build with a clear mind- it would’ve been a constant worry if we weren’t busting butt.

So- we were back at the original bank.  This time, I talked with this guy (who I actually talked to right after we asked the other two to put our application on hold until we figured out what to do) and he was much more knowledgeable.  He had done construction loans before, but it’s not something they do all the time- which makes sense seeing that people aren’t really building right now.  So we set up an appointment with him for March 16th to start the process all over again.  Come to find out- he needed to leave so we were sent to a young lady named Betty. 

I won’t lie, we were really nervous because she hadn’t done very many construction loans either and said herself that she would be using Mortgage Support to help her through the process, which is what the guy that we were supposed to meet with, advised.  Mike was pretty tense at first.  Betty was a real sweetheart.  We explained to her everything about the property, what we paid for it, what we put in for improvements, and how long we’ve owned it.  Mike explained that we were told by this woman about a year ago that there would not be a need to come up with anything upfront for a down payment since we had paid so much on the property already (and this was BEFORE we made changes to it!). 

Betty understood and we finally got to a point in the preliminary check of what our closing costs would be.  They looked MUCH better, but still included things like the Transfer Taxes and Title Insurance, etc.  We already paid all that when we purchased the property so why is it on there?!  Needless to say, the mortgage application at TD Bank is NOT friendly if you are looking for a construction loan.  Anyways- we agreed to the closing costs with the understanding that a few items would disappear and we started the application process.

Mind you, at this point, we sat there trying to figure out the closing costs and trying to make the numbers work for about 45 minutes.  I had left work at 2 to try to get back for 3.  Keep that in mind as we go through the next steps.

Betty walked us through the application.  We told her what we were looking to borrow, the value of the land (which we kept saying the original asking price plus the improvements we’ve made), and how much we still owe on the property.  We get to the closing costs part again and it has a ridiculous closing cost again (upwards of $30,000).  What the heck is going on?!  So on the phone with Mortgage Support and we go back through the beginning portion of the loan again to try to fix it.  A woman that works on loans often came into the bank at that point too and Betty pulled her in to try to help as well since the numbers weren’t working for us.  We finally figured it out and the young lady that helped us went to her desk to work on other stuff, and she let mortgage support go. 

That’s when her computer froze- completely locked up.  At this point it was already 3:45 PM and I’m in a panic thinking – they’re going to kill me at work!  So- we had to start the process again.  At this point, we’ve worked the numbers 4 times to get the closing costs to be agreeable- where it’s not $30,000 that we have to come up with.  If we had that kind of money, we probably wouldn’t be asking the bank for a loan- just saying.

So- we start it again.  Had the same problem AGAIN!  Betty called Mortgage Support again and got on the phone with a woman named Amy.  She was good.  What was happening was our land was being counted twice.  We do owe on it, but we put what we owe into the cost of construction to cover what is left over on the land.  That’s not what was messing up the mortgage application- in fact, it was two little BUTTONS that say- is the property mortgaged and is there money owed on the property.  If these are checked, it goes into closing costs.  Ridiculous!  Even Betty said that this was the most ridiculous form for a construction loan and it wasn’t friendly to our type of situation.  I don’t think using that form would be friendly to anyone period unless you were trying to buy a regular home.

We finally got through the process.  They ask some very odd questions like- what’s the value of the project… well what we are going to put into it is this- but it will be worth more than that- obviously.  Well, they want to know what it’s WORTH.  How the hell do we know?  We are not appraisers!  So a rule the bank has is they will support the land + 80% construction costs.  Our situation is different because we already own the land (and we thought this was the best, easiest way to get this done and be ahead of the curve). That being said, we need to have our house appraised at X amount in order to be able to cover what we project our construction costs will be plus the closing costs (which are small, but we’ve dumped every penny we own into this project.  The funny part in all of this is we asked for a loan on a total amount with labor- but we will only be using a small portion of that labor because Mike, myself, and whoever wants to help us, will be doing the work… will you work for Pizza and Beer?! J  Anyways- our estimated project cost is actually much higher than what we need because of the labor that’s built in. 

Regardless, we do need the appraisal to come in high so that we don’t have to come up with ridiculous closing costs.  By the time we gave Betty our life stories and signed away our first born so that we could build a house, it was 5 PM.  I missed three hours of work because the application system that TD uses is not user friendly at all for construction loans.  I thought I was going to die… Got back to work just past 5 and stayed till about 7 to make up for some of the time.  The nice thing is, my coworkers understood.  I didn’t get any real heat and explained what happened to the team manager and he was pretty cool with it.  I still felt super guilty, so I stayed to make up some time, then I made the rest the next week.

This whole process has been a bit of a nail biter since the start because there are SO many unknowns.  And you should see the PAPERWORK involved- holy CRAP!  I’ll make that a separate post- it’s just too much to keep going now.  I think it’s important to know what kind of paperwork is involved in a construction loan so that you understand what is expected.  We went to the bank with everything we thought we needed including specs, plans, plot plans, amort  calc on the land and payment history, the entire packet we received from the closing on the land to begin with- including the title insurance, tax returns, my pay stubs for the past month, ID, and septic approval.  We don’t currently have a building permit- that comes next week when we go to the town for it.


Building our home, one step at a time, learning patience, and loving more.

Monday, February 20, 2012

Obtaining a Physical Address, Septic Design, and Finishing Clearing!

I know it's been a while since I've last written, so for that I apologize.  We have been at a little bit of a standstill- waiting for the winter to be over so we can dig.  We have gotten a lot done though!

After the driveway was put in, we decided to try to get an address.  We thought it was going to be a pain to do, but really, it was quite easy!  We need the physical address for the State for when we submit the Septic Design.

How to get a physical address:
Contact your Selectman's Assistant (at least that's what we had to do!).  Let them know you are looking for a physical address and they will contact the Emergency Services person (in this case, it ended up being a friend of my Dad's!).  This individual is in charge of making sure that addresses are updated for emergency purposes (if you call 911 and need ambulance services, he makes sure that everything is up to date).  What he will need is your lot and map number (and frankly if you don't have it memorized at that point, I'd be surprised!), and you need to sign a little piece of paper that goes to the state.  THERE IS NO CHARGE (how awesome is that!?).  Anyways, it takes about 2 weeks normally to get the physical address.  The way they figure it out is they take the numbers from either side of your property (if you have neighbors) and do some measuring.  Figure out feet and have some sort of calculation that figures out what your physical address is.  It's kind of neat really.  They have to measure to the driveway apparently.

The other thing we've accomplished is an approved Septic Design!  Our Septic Guy (Pete Bissell) came out after the October storm of 22" when all the snow had melted off again, and did some digging.  He did the perc and did some calculations and what not and drew up a really nice design.  It's pretty impressive actually.  You have to go to the Selectmen at your town to get it signed off on.  He explained it all to us at a meeting a couple weeks ago now.  We were afraid that the town was going to give us trouble at first, but I think they were sympathetic, listened to Pete, which explained everything, and signed off.  It was really cool actually!  An example of what a Septic design looks like is:


This is kind of what one looks like.  Ours has lots of pretty colors, some elevations, etc.  It's really neat to look at actually!  Pete did a great job in designing it.  

After the town signs off on it, we write a check to the state DES (Department of Environmental Services).  You also write a check to the designer of course!  But there is no other cost at the town level... yet.  Once you get the signatures, the designer sends it to the State.  They approve it and send you a piece of paper (which I didn't really understand at first... it's all in typewriter format on a carbon copy type paper).  The Septic Designer then sends you a copy with the state signatures/approval on it.  

We also accomplished cutting many many more trees to clear the land since I last wrote.  We will have a rather large yard when we are done.  We were afraid that we were going to have to pay someone to take the logs out (very few hardwood, lots of soft), and were blessed to have a friend of my Dad's come over and wanted all the short softwood that we cut (5-6 foot lengths so that Mike and I could man-handle it to a pile somewhere... what a workout!).  

He asked what we planned on doing with the rest of the logs (the large ones) and we said we needed to find someone to take them.  Our prayers were answered about 2 hours after this friend of my Dad's came.  He brought back another guy, an older gentleman, that trucks for a mill.  He said he'd take it all! :)  Mike and I had been moving slowly to clear because we'd clean up and move the logs/brush out of the way to try to keep it cleaner.  Now we found someone to take the logs!  How exciting!  He's already taken 50 tons of logs off our property, and still has quite a bit to  go!  Mike worked all week to clear the rest.  The only thing standing now is the hardwood.   Pictures Below!  Please know this was soooo wooded at one point, that there was much more shade!  

Where our house will be...

Love this Tractor.  I want one just like it!  Winch, Thumb, and All!

The left side of our property now

Backyard area

A small portion of the logs coming off the property!

Mike did have a mishap last week when he was clearing (without me since I had to work, but was with his Dad and this older gentleman).  He cut a tree down and it got wedged in another.  He started limbing it and one of the big limbs jumped up and whacked him in the face.  He chipped his front tooth, got a nice gash on his chin, and his mouth was so swollen that night.  Not exactly what I wanted to hear a mere week before the wedding!!  Fortunately, his beard covers the gash, the swelling has gone down, and if you didn't know the story, you wouldn't know that his tooth was chipped.  It's crazy though because we started slowly clearing the property in July, took a break when Dad ended up in the hospital, and then again when his cousin was building his house, and all this time, no one got seriously hurt until then.  Of course, that makes me feel comfortable that he wants to go and keep cutting.  Ugh!

Next step: We are going to the bank tomorrow to see if they will approve our house and give us money!! WOOT!

That's the update for now!  I've been crazy busy with wedding planning and such.  I can't believe that I'll be taking his last name this Saturday.  It's come up so quick!  Can't wait to spend the rest of my life with him.

Building Dreams, Building our Future <3

Friday, November 4, 2011

A Little Discussion Goes a Long Way

I sent an email to the town rep yesterday (as you know) that I would like to pick up the road bond either today or Monday.  I guess he was away at meetings all week, so he hadn't been able to get back to me.  Coincidentally, he called my Mom (because she works with said rep) and said that the lawyer  should have it ready today or Monday.  Yay!  I've found that you have to get a little pushy with this town in order to get them to do anything... but at least this part is over!

I also emailed the guy that takes care of getting physical addresses yesterday since I hadn't  heard back on the process for that.  He asked me if I filled out paperwork, which I didn't know we had to, but he was great.  He was like no problem, I'll bring it over to the property tomorrow and we can meet up then.  Come to find out, he  is one of my Dad's friends!  So when I told Dad I was meeting him, he wanted to see him too.  This guy was awesome.  Dad launched into a conversation about what Mike and I had gone through just to get the driveway.  He said that the road agent was an ass and really hard to work with.  It cracked me up!  He told me that he would've told the Road Agent to pound sand when we told him that the road agent wanted us to get the driveway engineered.

Mike was afraid that I was  going to piss off the town if I got too pushy, but after talking to the emergency contact of Sharon, it only renewed my spirits to really go after them to get what we want.  I don't disagree with Mike that we need to be careful and pick our fights carefully, but at the same time, we shouldn't back down either!

oh, p.s. The guy taking care of the physical address for us told us that we didn't need the second culvert, that it was just a waste.  That also made me laugh, especially after how I told him we were trying to squeal out of getting the driveway engineered.

Thursday, November 3, 2011

Driveway Complete!

Well since the last time I posted, our driveway has been completed!  Eric was able to put the whole driveway together in a quick turnaround time (3 days in total really) and we have an apron... of 20 feet.  We aren't completely pleased with the apron, so the people that did it originally are due to come back and fix it.  We think they put it down cold so it's a bit crumbly and bumpy, and that's not what we were looking for.

In any case, the driveway was considered finished almost 2 weeks ago.  I asked the town to send out the road agent to sign off on the road bond being complete.  Of course, I can't expect much from this road agent seeing that he doesn't like to work WITH people.  They have yet to get back to me on the status of the road bond.  It's really starting to tick me off, so I sent another (4th or 5th) message to the town rep that I use and asked him what the status was and that I would like to pick up the check from the lawyers office tomorrow since all obligations have been fulfilled.  If there was a question about the apron, it's there, and I even had Mike shovel it off on Tuesday in case the road agent hadn't looked at it yet.

The best part is, I have before and after pictures.  The road is completely untouched, which is why I'm starting to push harder on the road bond.  We gave them the road bond within two days, so I expect to be treated fairly and have the same turnaround time that we gave them.  It's only respectful.  That being said, I told the town contact that I will be going to the lawyers office tomorrow to pick it up, and if it's not ready then, I will have my Mom pick it up on Monday.  I'm done playing this game, especially when this money is due to Eric.  It's not fair for him to be waiting on the town when the road is in the exact same condition it was before he even started.

That's my spiel.  I'll let you know how it goes after I visit the lawyer tomorrow!